Built in 2009 after a number of years trying to get planning permission and a lengthy archaeological dig! 125m row lengths created a new challenge with NFT. This site has everything ranging from a steam biomass boiler, an Anaeobic Digester, PV, CHP and on site Carbon dioxide.